Cane 1 approaching the Clewiston Yard Limits with a friendly wave from the engineer, ending the chase from Venus to Clewiston of US Sugar’s newly acquired tunnel motor. The big American flag in ... (more)
Cane 3 back on the move with 35 empties for the North fields, a lowboy trailing getting stuck on a crossing would delay them for about 15 minutes before they got back on the move.
With a one of a kind railroad, comes one of a kind views. Seen here is Sugar Road Job 1 passing the Vaughn 1 loadout on the USSC Clewiston Mainline, featuring HLCX 6341 leading. Additionally, mixe... (more)